(103R1) Foundations and brickwork
- GKC/CC/3/38/1
- Item
- 1958-1966
(103R1) Foundations and brickwork
(282) Classroom block/ layout of roof boarding: 1/4"-1'0"
(053) Boiler room/ cold water supply: 3/8"
(011) 1/8" Section through classroom
Mislaid?
(113R1) 1/8" Roof joist layout
(284) Sanctuary rooflight details
(122) Setting out/ sanctuary block
(128) Sacristy floor plan: 1/4"
(220A) Table desk for SBR: 1" & 1/2FS
Tabernacle drawing/ front & side elevation, roof & base plans: 1/4"=1"
Plan showing road sewer & ground levels: 1/16=1ft
(226) Common room floor plan: 1/4"-1'0"
(235) Toilets/convector details: 1"-1'0"
Details of RW outlets to gutter units: 1/2FS
Details of RW outlets to Balc Units: 1/2FS
(007) 1/8" section through chapel.
(008) 1/8" Section thro' sanctuary
(003A) 1/8" Classroom floor plan