Showing 1821 results

Archival description
*Not available / given Folder
Print preview View:

4 results with digital objects Show results with digital objects

Drawings & Plans: Black Cat Studios, Glasgow

Folder contains:

  • MAIN NUMBERED SET CONT'D:
  • GKC/BCS/3/3/1: (12C) section elevations of entrance hall, with key plan: 1:25
  • GKC/BCS/3/3/2: (13) sections 1-1, 2-2, and 3-3 of entrance hall, with key plan (superceded)
  • GKC/BCS/3/3/3: (14) ground floor plan with lighting layout, annotated: 1:100
  • GKC/BCS/3/3/4: (14B) ground floor plan with lighting layout, annotated: 1:100
  • GKC/BCS/3/3/5: (15) ground floor plan with electrical power layout: 1:100
  • GKC/BCS/3/3/6: (16) ground floor plan with layout of worktop/desks and 'spur' shelving, and worktop desk section: 1:10 and 1:100
  • GKC/BCS/3/3/7: (17) glazed screen, production dept: 1:10 and 1/2 fs plans, section, and elevation
  • GKC/BCS/3/3/8: (18A) 'lean-to' plan: 1:50
  • GKC/BCS/3/3/9: (19) main gate: 1:20 plan, section, and elevation
  • GKC/BCS/3/3/10: (20) service gate: 1:20 plan, section, and elevation.

*Not available / given

Drawings & Plans: Black Cat Studios, Glasgow

Folder contains:

  • UNNUMBERED, UNDATED SET CONT'D:
  • GKC/BCS/3/6/1: ground floor plan as proposed: 1:100
  • GKC/BCS/3/6/2: ground floor plan
  • GKC/BCS/3/6/3: ground floor plan
  • GKC/BCS/3/6/4: ground floor, part plan
  • GKC/BCS/3/6/5: first floor plan as existing: 1:100
  • GKC/BCS/3/6/6: first floor plan as proposed: 1:100
  • GKC/BCS/3/6/7: first floor plan
  • GKC/BCS/3/6/8: projection room and viewing theatre: plan
  • GKC/BCS/3/6/9: sketch plan
  • GKC/BCS/3/6/10: plans and elevation of rejected scheme.

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/117/1: (2.205) light well paving layout: 1/4"=1Ft
  • GKC/CO-OX/3/117/2: (224) 1/4" details of entry to shop
  • GKC/CO-OX/3/117/3: possible service road & service area arrangement: 1:100
  • GKC/CO-OX/3/117/4: (BL26) door to workroom/ plan & sections: 1/2"-1'0"
  • GKC/CO-OX/3/117/5: (BL28A) 1/2FS elevation of adjustable shelf divider/ 1/2FS plan & 1/2FS isometric view of locating plate
  • GKC/CO-OX/3/117/6: (BL18B) plans. sections, elevations & details: 1"-1'0"
  • GKC/CO-OX/3/117/7: proposed sun grille/ fellows court: 1" & 1/4"
  • GKC/CO-OX/3/117/8: college rooms over shop/ floor plans: 1/8"-1'0"
  • GKC/CO-OX/3/117/9: (BL14C) sectional elevation 8-10: 1/4"-1'0"
  • GKC/CO-OX/3/117/10: plan
  • GKC/CO-OX/3/117/11: (BL13D) key plan & section elevations 4-7: 1/4"-1'0"
  • GKC/CO-OX/3/117/12: (BL15C) key plan/ section elevations 11 & 12: 1/4"-1'0"

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/121/1: (BL41A) sections, side elevation & front elevation: 1"-1'0"
  • GKC/CO-OX/3/121/2: (2.206) 3/4" shop front
  • GKC/CO-OX/3/121/3: flank walls
  • GKC/CO-OX/3/121/4: shop front sign: 1"-1'0"
  • GKC/CO-OX/3/121/5: (BL50B) plan & section: 1"-1'0"
  • GKC/CO-OX/3/121/6: shop front (gate)
  • GKC/CO-OX/3/121/7: (45) 1/2FS section
  • GKC/CO-OX/3/121/8: (2.220) shop staircase/ FS details
  • GKC/CO-OX/3/121/9: (2221) shop staircase/ FS details
  • GKC/CO-OX/3/121/10: (2218) 1/2" plan & elevations of shop front

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/124/1: (BL16C) plan & section/ haffit & cross-section shelving: 1/2FS
  • GKC/CO-OX/3/124/2: (BL21A) browsery/ plan detail, section & elevation:1"=1'0"
  • GKC/CO-OX/3/124/3: (BL20)counter/ plan, section & elevation: 1"=1'0"
  • GKC/CO-OX/3/124/4: shop front / elevation
  • GKC/CO-OX/3/124/5: (BL10C)1/4" scale plan/ manager's room ground floor
  • GKC/CO-OX/3/124/6: shop front sign: 1"-1'0"
  • GKC/CO-OX/3/124/7: 1/2" elevation/ shop sign
  • GKC/CO-OX/3/124/8: (BL17C) part plan, part section & part elevation:1"=1'0".
  • GKC/CO-OX/3/124/9: (BL10C) plan:1/4"=1'0"
  • GKC/CO-OX/3/124/10: (BL11C) plan: 1/4"=1'0"

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/126/1: (BL60A) shop stair handrails/ details: 1/2FS
  • GKC/CO-OX/3/126/2: (BL61) door to antiquarian room/ details: 1/4"=1'0" & 1/4FS
  • GKC/CO-OX/3/126/3: plan, section & elevation/ pamphlet rack: 1"=1'0"
  • GKC/CO-OX/3/126/4: (2.64) sections area 2: 1/4"=1'0"
  • GKC/CO-OX/3/126/5: (2.65) sections: 1/4-1'0"
  • GKC/CO-OX/3/126/6: (BL42) elevation (lift door/ basement), plan, elevation (recess) & section: 1" & 1/4FS
  • GKC/CO-OX/3/126/7: (33) plan/ door at lift (basement), elevation from shop & plan/ door to staff room (basement): 1"-1'0"
  • GKC/CO-OX/3/126/8: (BL22B) island fitment/ plans & sections: 1"=1'0"
  • GKC/CO-OX/3/126/9: (34) plan to workroom (basement)/ elevation from shop & plan to boiler room(basement): 1"-1'0"
  • GKC/CO-OX/3/126/10: shelving detail prelim proposals: 1".

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/128/1: (1) plan/ Holywell site development
  • GKC/CO-OX/3/128/2: (2)plan/ Holywell site development

Small Folder contains (see similar in folder 127):

  • GKC/CO-OX/3/128/3: (4) ground floor/plan
  • GKC/CO-OX/3/128/4: (5) first floor/plan
  • GKC/CO-OX/3/128/5: (6) 2nd floor/plan.
  • GKC/CO-OX/3/128/6: plan
  • GKC/CO-OX/3/128/7: plan
  • GKC/CO-OX/3/128/8: plan
  • GKC/CO-OX/3/128/9: plan

MISLAID:

  • GKC/CO-OX/3/128/0: sections

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/118/1: (2.185) sizes for paving slabs
  • GKC/CO-OX/3/118/2: extract from mid floor slab: 1/4"=1'0"
  • GKC/CO-OX/3/118/3: (2.197) dimensions of lightwell: 1/2"=1'0"
  • GKC/CO-OX/3/118/4: (49A) elevation of screen round mid floor: 1/4"-1'0" & 1/2FS
  • GKC/CO-OX/3/118/5: (2.203) 1" screen setting out
  • GKC/CO-OX/3/118/6: (2.200A) internal & external grilles at lightwell: 11/2" & 1/2"=1FT
  • GKC/CO-OX/3/118/7: (2.204) lightwell paving set out: 1"=1FT
  • GKC/CO-OX/3/118/8: (2.200) internal & external grilles: 11/2" & 1/2"=1FT
  • GKC/CO-OX/3/118/9: (2.201) half plan of screen: 1/2"
  • GKC/CO-OX/3/118/10: 1" elevation from street/ section A-A & elevation.

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/119/1: (223) 1" details of entry to shop/ flank walls L & R
  • GKC/CO-OX/3/119/2: (223) 1" details of shop entry/ framing layout
  • GKC/CO-OX/3/119/3: (220R) 1" details of entry to shop
  • GKC/CO-OX/3/119/4: (221L) 1" details of entry to shop
  • GKC/CO-OX/3/119/5: sketch proposals for boiler room ceiling: 1/8" & 1/4"-1'0"
  • GKC/CO-OX/3/119/6: (BL27A) shelving: 1"-1'0"
  • GKC/CO-OX/3/119/7: (BL19D) sectional elevations 13-15: 1/4"-1'0"
  • GKC/CO-OX/3/119/8: (BL30C) proposed lighting/ ground & mid floors: 1/4"-1'0"
  • GKC/CO-OX/3/119/9: (BL) details: 1/4"-1'0"
  • GKC/CO-OX/3/119/10: (BL) plans, sections & details: 1/4"-1'0"

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/120/1: (220L) 1" details of entry to shop/flank wall 'L' & Plan on level X
  • GKC/CO-OX/3/120/2: (225) 1/4FS details of entry to shop
  • GKC/CO-OX/3/120/3: (221L) 1" details of entry to shop/ flank wall 'L' & plan on Level Y
  • GKC/CO-OX/3/120/4: (2.207) FS detail of shop front
  • GKC/CO-OX/3/120/5: 1/2" elevation/ shop front
  • GKC/CO-OX/3/120/6: (BL23) plan, section & elevations: 1"=1'0"
  • GKC/CO-OX/3/120/7: lettering
  • GKC/CO-OX/3/120/8: lettering
  • GKC/CO-OX/3/120/9: (219) 1/2" plan, section & elevations of display
  • GKC/CO-OX/3/120/10: proposed shop front: 1/4"-1'0"

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/122/1: shop front
  • GKC/CO-OX/3/122/2: section & elevations of shop front: 1/4"-1'0"
  • GKC/CO-OX/3/122/3: (2.114) basement floor plan: 1/8"
  • GKC/CO-OX/3/122/4: front elevation and plan/shop entrance: 1:50
  • GKC/CO-OX/3/122/5: (2.64) sections/ area 2: 1/4"=1'0"
  • GKC/CO-OX/3/122/6: (BL25A) sliding fitments: 1/2FS
  • GKC/CO-OX/3/122/7: (2.61) ground floor plan/area 2: 1/4"=1'0"
  • GKC/CO-OX/3/122/8: (2.172) first floor roof windows to toilets: 1/2"
  • GKC/CO-OX/3/122/9: (48B) plan thro' glazing above door: 1/4FS& 1"-1'0"
  • GKC/CO-OX/3/122/10: (BL31B) proposed lighting/basement: 1/4"-1'0"

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/123/1: fitments
  • GKC/CO-OX/3/123/2: (BL39) alternative lighting proposals/ shopfront lightwell: 3/4"-1'0"
  • GKC/CO-OX/3/123/3: detail prelim proposals: 1"
  • GKC/CO-OX/3/123/4: (BL24) plans, sections & sectional elevations: 1/4"-1'0"
  • GKC/CO-OX/3/123/5: sections
  • GKC/CO-OX/3/123/6: (BL29) sliding fitment: 1"-1'0"
  • GKC/CO-OX/3/123/7: cross & long sections: 1/8"-1'0"
  • GKC/CO-OX/3/123/8: 1/2" elevation/ shop sign
  • GKC/CO-OX/3/123/9: 1/2" elevation/ shop sign (sch 2).
  • GKC/CO-OX/3/123/10: shop front showing access

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/125/1: (BL43) 1/2" plan/ basement
  • GKC/CO-OX/3/125/2: (BL) shelving between stairs: 1"-1'0"
  • GKC/CO-OX/3/125/3: (BL37A)1" plan/ door to working area ground floor
  • GKC/CO-OX/3/125/4: (BL36) FS details/ haffits
  • GKC/CO-OX/3/125/5: (35) plans: 1/2FS
  • GKC/CO-OX/3/125/6: (BL32B) staircase to mid-floor/ sections & elevation: 1/2"=1'0"
  • GKC/CO-OX/3/125/7: (46A) plan, elevation & section/bookshelf: 1"-1'0"
  • GKC/CO-OX/3/125/8: (BL47) plan of wall to staff room/ basement: 1"-1'0" & 1.4FS
  • GKC/CO-OX/3/125/9: (44) sections: 1/4FS
  • GKC/CO-OX/3/125/10: (BL40B) plan, elevation from mid- floor & sections: 1/4"-1'0".

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/3/133/1: elevations
  • GKC/CO-OX/3/133/2: (193) south elevation: 1:50
  • GKC/CO-OX/3/133/3: (3) new building/ MCR elevation
  • GKC/CO-OX/3/133/4: deck level+/ plan & first floor level plan
  • GKC/CO-OX/3/133/5: (2) elevation
  • GKC/CO-OX/3/133/6: elevation
  • GKC/CO-OX/3/133/7: sketch elevation
  • GKC/CO-OX/3/133/8: proposed cafeteria extension
  • GKC/CO-OX/3/133/9: proposed garden layout/ adjacent to music room
  • GKC/CO-OX/3/133/10: elevation showing library, staircase, addition & new building.
  • GKC/CO-OX/3/133/11: long & cross sections and elevation to music room quad

*Not available / given

Drawings & Plans: (Blackwell's Bookshop) Wadham College, Oxford

Folder contains:

  • GKC/CO-OX/127/3/1: (7) 3rd floor plan/ Holywell Site development
  • GKC/CO-OX/127/3/2: (8) sections/Holywell Site development
  • GKC/CO-OX/127/3/3: stair for shop: 3/4"
  • GKC/CO-OX/127/3/4: (5) ground floor plan: Kings Arms
  • GKC/CO-OX/127/3/5: shelving support/details: 1/8"
  • GKC/CO-OX/127/3/6: (2.54) ground floor plan of temporary toilets for King's Arms & Blackwell's: 1/4"=1'0"
  • GKC/CO-OX/127/3/7: (2.62) basement plan/ area 2: 1/4"=1'0"
  • GKC/CO-OX/127/3/8: (BL12B) sectional elevations: 1/4"-1'0"
  • GKC/CO-OX/127/3/9: door schedule: 1/4"-1'0"

Tube contains:

  • GKC/CO-OX/127/3/10: plan at gables/ corner detail

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/11/1: (90A) third floor folding door/ plan, section & elevation: 1/4FS & 3/8"-1'0"
  • GKC/SBU/3/11/2: section at intermediate landings: 1/4FS
  • GKC/SBU/3/11/3: (150) doors to cashier's room & store
  • GKC/SBU/3/11/4: (135) plan, details, fitment/ cashier's room: 1/4FS
  • GKC/SBU/3/11/5: fibre glass panels/ shop
  • GKC/SBU/3/11/6: (68A) roof housing/ FAI: 3/4"
  • GKC/SBU/3/11/7: (162) framing/ telephone equipment room: 1/2" & 1/4FS
  • GKC/SBU/3/11/8: (131) wallboard layout on ceiling/shop: 1/4"
  • GKC/SBU/3/11/9: (170) additional TCU in BOA room: 1/2"-1foot
  • GKC/SBU/3/11/10: (76) first & second floor cupboard/ plan & elevation: 3/8"
  • GKC/SBU/3/11/11: (87) lift/ sections & details: 1/2"-1'0" & 1/8FS

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/12/1: (009) details of dividing wall to stair/ ground floor
  • GKC/SBU/3/12/2: heating duct ground floor: 1/4" & 1/2"
  • GKC/SBU/3/12/3: (74A) door frames/ plan details: 1/2FS
  • GKC/SBU/3/12/4: (98B) details/balustrade stair: 1/4FS & 1"
  • GKC/SBU/3/12/5: (69) roof tank supports/plan & section: 3/4"
  • GKC/SBU/3/12/6: porch Mitchell Lane/ sections: 1/8FS
  • GKC/SBU/3/12/7: (006b) basement & ground floor plans (proposed)
  • GKC/SBU/3/12/8: (002) section to first floor
  • GKC/SBU/3/12/9: (52) elevation from adjoining site: 1/8"
  • GKC/SBU/3/12/10: ceiling/ lighting details: FS

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/2/1: section through west stair: 3/8"
  • GKC/SBU/3/2/2: (6277-SK4) column schedule for columns L21 - L28
  • GKC/SBU/3/2/3: (30Y) drainage layout
  • GKC/SBU/3/2/4: (110RA) ceiling framing/shop: 1/2" & 1"
  • GKC/SBU/3/2/5: diffusers in shop
  • GKC/SBU/3/2/6: (50A) roof plan: 1/4"

Tube contains:

  • GKC/SBU/3/2/7: (6277-16D) plan at basement level: 3/8" & 1/4" to 1'0"
  • GKC/SBU/3/2/8: (6277-10D) steelwork arrangement at ground floor: 1/4", 3/8" & 3/4" to 1'0"
  • GKC/SBU/3/2/9: (6277-11D) steelwork arrangement at mid-floor between ground & 1st floors: 1/4", 3/8" & 3/4" to 1'0"
  • GKC/SBU/3/2/10: (6277-12D) steelwork arrangement at 1st floor:1/4", 3/8" & 3/4" to 1'0"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/20/1: (127) second floor staff room fitment: 1/2"-1'0" & 1/8"=1"
  • GKC/SBU/3/20/2: (1/008) side screen to high level desks/ side elevation.
  • GKC/SBU/3/20/3: sections thro' north wall: 1/2"
  • GKC/SBU/3/20/4: (1/003) corner desk unit details/ plan, section & elevation
  • GKC/SBU/3/20/5: (1/009) telephone drawer high level desks:1:5
  • GKC/SBU/3/20/6: (018) proposed jamb alteration/ 1st floor staff room & kitchen: 1/2FS
  • GKC/SBU/3/20/7: ceiling access/ 3rd floor: 1/4FS
  • GKC/SBU/3/20/8: (020) proposed lighting trough/ first floor plan & sections
  • GKC/SBU/3/20/9: (1/001A) low level sales desk/ plan, section & elevation
  • GKC/SBU/3/20/10: (1/002A) vertical storage cabinet/ plan, section, elevation & detail
  • GKC/SBU/3/20/11: ground floor/ plan (proposed): 1/50

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/21/1: (01) third floor plan/ minor alterations: 1/4"-1'0"
  • GKC/SBU/3/21/2: diffusers for shop lighting/ plans
  • GKC/SBU/3/21/3: (160) diffusers for shop lighting/ plans & sections: 1/4FS & FS
  • GKC/SBU/3/21/4: (155) door to escape stair/ sections
  • GKC/SBU/3/21/5: burglar bars for access panel to telephone room/ plan, section & elevation
  • GKC/SBU/3/21/6: (51B) roof details: 11/2"
  • GKC/SBU/3/21/7: (022) proposed staff kitchen layout.
  • GKC/SBU/3/21/8: (107R) sections/ facade Mitchell & Gordon Lanes: 1/4FS
  • GKC/SBU/3/21/9: (014) elevation of screen to ground floor
  • GKC/SBU/3/21/10: (012A) revised elevations: 1/2"-1'0"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/26/1: (159) fitments in store: 1/2"-1'0"
  • GKC/SBU/3/26/2: (151) Mitchell Lane/ porch doors: 1" & 1/2FS
  • GKC/SBU/3/26/3: (143) clerestorey/ Buchanan St: 1/2" & 1/4FS
  • GKC/SBU/3/26/4: (136) pavement/ plan & section: 1/4"
  • GKC/SBU/3/26/5: (137) ground floor column details: 1/4FS
  • GKC/SBU/3/26/6: lift door details:FS
  • GKC/SBU/3/26/7: (92) third floor/ heater in female toilet: 1/4"
  • GKC/SBU/3/26/8: (153) plan & sections: 1/2" & 1/4FS
  • GKC/SBU/3/26/9: (108A) internal elevations: 1/4"
  • GKC/SBU/3/26/10: (147) entrance lobby/ plan, section & elevations: 1/4"-1" & 1/2"-1'0".

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/3/1: (30Z) floor plans/occupant capacity: 1/8"
  • GKC/SBU/3/3/2: (16A) basement plan: 1/4"
  • GKC/SBU/3/3/3: (001A) basement & ground floor plans
  • GKC/SBU/3/3/5: (30X) floor plans/firefighting equipment: 1/8"
  • GKC/SBU/3/3/6: (19A) third floor plan: 1/4"
  • GKC/SBU/3/3/7: (18A) first floor plans: 1/4"
  • GKC/SBU/3/3/8: (17) ground floor plans: 1/4"
  • GKC/SBU/3/3/9: (31) locality & site plans: 25" - 1 mile, 1/16"
  • GKC/SBU/3/3/10: (32) plans/ existing buildings: 1/8"

Tube contains:

  • GKC/SBU/3/3/4: (6277-17A) column schedule

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/8/1: sections (revised)
  • GKC/SBU/3/8/2: brochure rack details (revised)
  • GKC/SBU/3/8/3: suspended ceiling & lighting layout (proposed alterations): 1:50
  • GKC/SBU/3/8/4: (032) unit X/ details: FS & 1/8FS
  • GKC/SBU/3/8/5: plan, sect, elev5tion & details/ vertical storage cabinets
  • GKC/SBU/3/8/6: (007) suspended ceiling & lighting layout: 1:50
  • GKC/SBU/3/8/7: (019) sections/ ground floor sales area
  • GKC/SBU/3/8/8: (138) ground floor/ door to basement: 3/8"-1'0" & 1"-1'0"
  • GKC/SBU/3/8/9: (025) plans & sections/ basement (existing) : 1:20
  • GKC/SBU/3/8/10: (025) plan & sections/ basement (existing): 1:20

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/9/1: (001) basement & ground floor/plans
  • GKC/SBU/3/9/2: (003) sections as existing
  • GKC/SBU/3/9/3: (002) section/first floor
  • GKC/SBU/3/9/4: (005) section B-B (existing)
  • GKC/SBU/3/9/5: (007b) plans & sections/ basement & ground floor
  • GKC/SBU/3/9/6: (008c) section B-B (proposed)
  • GKC/SBU/3/9/7: (023) plan/basement (existing): 1:20
  • GKC/SBU/3/9/8: (024) plan of proposed floor slab: 1:20
  • GKC/SBU/3/9/9: (004) section A-A & plan/basement stair (existing)

missing?

  • GKC/SBU/3/9/: (004) plan/ basement stair (existing)

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/16/1: (49B) part roofing layout/ roof light partitions: 1/4"-1ft
  • GKC/SBU/3/16/2: (X71B) col. cladding detail at N wall: 1/4FS
  • GKC/SBU/3/16/3: (102A) elevations/ facade shop: 1/8"
  • GKC/SBU/3/16/4: (011a) proposed elevations/ Mitchell & Gordon Lanes
  • GKC/SBU/3/16/5: section thro east stair (mid-1st floor):1/2"
  • GKC/SBU/3/16/6: (005A) section c-c: 1:50
  • GKC/SBU/3/16/7: plan
  • GKC/SBU/3/16/8: (58) 2nd floor plan & internal elevations: 1/4"-1'0"
  • GKC/SBU/3/16/9: (59) 1st floor plan & internal elevations: 1/4"-1'0"
  • GKC/SBU/3/16/10: plan & sections/junction 2 panels

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/29/1: (118A) lettering on shop facade/ elevation: 1/2" & 1/8FS
  • GKC/SBU/3/29/2: temporary exit door/ plan, section & elevation: 1/2" & 1/4FS
  • GKC/SBU/3/29/3: (54O) 3rd floor internal partitions/ plan, sections & detail: 1/4"
  • GKC/SBU/3/29/4: (152) fibre glass panels in shop/ plan & sections
  • GKC/SBU/3/29/5: (49B) roof framing plan/ plan & sections: 1/4" & 3/8"
  • GKC/SBU/3/29/6: (19H) 3rd floor plan: 1/4"
  • GKC/SBU/3/29/7: (49A) roof framing plan/ plan & sections: 1/4" & 3/8"
  • GKC/SBU/3/29/8: (83) 3rd floor hose reel & heater/ plan, section & elevations: 1"
    A4 REPRODUCTIONS:
  • GKC/SBU/3/29/9: Elevation from Buchanan Street
  • GKC/SBU/3/29/10: Floor plans
  • GKC/SBU/3/29/11: Locality plan
  • GKC/SBU/3/29/12: Map of city center showing location
  • GKC/SBU/3/29/13: Cross section
  • GKC/SBU/3/29/14: Description of project
  • GKC/SBU/3/29/15: Map of city center showing location
  • GKC/SBU/3/29/16: Locality map
  • GKC/SBU/3/29/17: Locality plan

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/5/1: (57D) mid floor partition: 1/4"
  • GKC/SBU/3/5/2: (76) first & second floor cupboards: 3/8"
  • GKC/SBU/3/5/3: (93) folding door/ third floor: 1/4FS, 1"REP1'0"
    GKC/SBU/3/5/4: (146C) reception hatch/ mid floor: 1/2"-1'0", 1/4FS & 1/2FS
  • GKC/SBU/3/5/5: (62) FAI: 1/4"
  • GKC/SBU/3/5/6: heater position/ male toilets: 1/2"-1'0" & 1/4FS
  • GKC/SBU/3/5/7: (72A) plan, sect & elevation/ lift motor room: 3/4" & 1/2FS
  • GKC/SBU/3/5/8: (72) flute roof junction: 11/2"
  • GKC/SBU/3/5/9: (79) ground floor plan: 1/4"
  • GKC/SBU/3/5/10: roof & duct junction: 11/2" & 1/2"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/6/1: (99A) internal partition/ 2nd floor: 3/8" & 1/2FS
  • GKC/SBU/3/6/2: plan of ground floor (proposal) : 1/50
  • GKC/SBU/3/6/3: (96) 2nd & 3rd floor FAI: 1"-1'0" & 1/2"-1'0"
  • GKC/SBU/3/6/4: (002) ground floor as proposed: 1:50
  • GKC/SBU/3/6/5: (003B) 1st floor (proposal): 1:50
  • GKC/SBU/3/6/6: (019A) proposed female staff cloak room: 1:5 & 1:20
  • GKC/SBU/3/6/7: (017) proposed lighting for panels: 1:20
  • GKC/SBU/3/6/8: (018) heating alterations/mezzanine floor: 1:50
  • GKC/SBU/3/6/9: (142A) sections & elevations: 1/4FS, 1/2" & 1/2"-1'0"
  • GKC/SBU/3/6/10: (108) internal elevations: 1/4"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/1/1: floor plans: 1:100
  • GKC/SBU/3/1/2: (20) long section/shops & offices: 1/4"
  • GKC/SBU/3/1/3: (22A) cross sections/ shops & offices: 1/4"
  • GKC/SBU/3/1/4: (34) elevations/ shop & offices: 1/8"
  • GKC/SBU/3/1/5: (013A) ceiling grid of concealed suspended treetex acoustic tiles:
    1:50
  • GKC/SBU/3/1/9: (33) elevation/ shops & offices: 1/8"

Tube contains:

  • GKC/SBU/3/1/6: (6277-13D) steelwork arrangement at 2nd floor: 1/4", 3/8" & 3/4" to 1'0"
  • GKC/SBU/3/1/7: (6277-14D) steelwork arrangement at 3rd floor: 1/4", 3/8" & 3/4" to 1'0"
  • GKC/SBU/3/1/8: (6277-15A) steelwork arrangement at roof level (prelim

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/13/1: (18) 1st & 2nd floor plans: 1/4"
  • GKC/SBU/3/13/2: (16) basement plan: 1/4"
  • GKC/SBU/3/13/3: (34B) elevations: 1/8"
  • GKC/SBU/3/13/4: (116) plan & elevation/ ceiling: 1/4"
  • GKC/SBU/3/13/5: (013) suspended ceiling system (revised): 1:50
  • GKC/SBU/3/13/6: (004) sections a-a & b-b (proposed alterations): 1:50
  • GKC/SBU/3/13/7: (132) sections thro' stair over shop: 1/2"
  • GKC/SBU/3/13/8:(140) plan & details/ secretaries' room: 1/4FS
  • GKC/SBU/3/13/9: (71B) plans & sections: 1/2"
  • GKC/SBU/3/13/10/: (95) elect. cupboard/ 3rd floor: 1/8FS & 3/4"-1'0"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/14/1: (103A) steel frame facade/ plan & elevations: 1/8"
  • GKC/SBU/3/14/2: (103R) SW framing/ facade shop: 1/8"
  • GKC/SBU/3/14/3: (119) sections/ shop ceiling: 1/2"
  • GKC/SBU/3/14/4: (101) glazed door 3rd floor/ sections: 1"-1'0"& 1/2FS
  • GKC/SBU/3/14/5: (124A) skin/ facade shop: 1/8"-1' & FS
  • GKC/SBU/3/14/6: (133) sections/ east stair: 3/8", 1/2" & 1/4FS
  • GKC/SBU/3/14/7: (134) elevations & sections/ cashier's room: 1/2"
  • GKC/SBU/3/14/8: (133B) cashier's office/ detail & elevation: 1/2" & 1/4"
  • GKC/SBU/3/14/9: (145) details/ stair: 1/4FS
  • GKC/SBU/3/14/10: lift door details at mid 1st & 2nd floor: 1/4FS

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/15/1: (46 B) basement/ brick partitions plan, sect & elevations: 1/4",11/2" &1/4FS
  • GKC/SBU/3/15/2: (47) door details/ elevations: FS, 1/2FS & 3/4"-1'0"
  • GKC/SBU/3/15/3: (91) lift door/ sections & elevation: 1"-1'0", 1/4FS, 1/2FS & FS
  • GKC/SBU/3/15/4: (120) plan/ hangers ceiling: 1/4"
  • GKC/SBU/3/15/5: vent grille/ telephone room: 1/4FS
  • GKC/SBU/3/15/6: (142) Buchanan St entrance door: 1/4FS & 1/2"
  • GKC/SBU/3/15/7: (56E) first floor partitions: 1/4" & 1/4FS
  • GKC/SBU/3/15/8: (56E) 1st floor partitions: 1/4" & 1/4FS
  • GKC/SBU/3/15/9: (100) stair mid-ground floor/ sections: 3/8-1'0" & 1/4FS
  • GKC/SBU/3/15/10: (129) horizontal plates/ axonometric: 1/4FS

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/17/1: (22D) cross sections/ 1/4"
  • GKC/SBU/3/17/2: (37) plans, sections, details/ lift well: 1/4", 1/2" & 1/4FS
  • GKC/SBU/3/17/3: (32) plans/ existing bldg: 1/8"
  • GKC/SBU/3/17/4: (109R) details sections/ shop facade
  • GKC/SBU/3/17/5: (004) section A-A & plan/basement stair (existing)
  • GKC/SBU/3/17/6: (003) sections as existing
  • GKC/SBU/3/17/7: (028) proposed metals stair to basement: 1:20 & 1:5
  • GKC/SBU/3/17/8: (02) elevations of offices & detail section: 1:20 & 1:2
  • GKC/SBU/3/17/9: (023) plan of basement (existing)

MISLAID

  • GKC/SBU/3/17/: (001B) plans/ Empire House Sauchiehall St: 1/8"-1'0"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/22/1: (44D) door types/ details: 1/2"
  • GKC/SBU/3/22/2: (030) drawer insert to low level sales desks/ plans & sections
  • GKC/SBU/3/22/3: (018) ticket & cash drawers/ plans & sections
  • GKC/SBU/3/22/4: (007A) plans as proposed: 1/8"-1'-"
  • GKC/SBU/3/22/5: (61) third floor plan & internal elevations: 1/4".
  • GKC/SBU/3/22/6: midfloor plan & sectional elevations: 1/4"
  • GKC/SBU/3/22/7: (010) plan of screen infill panel/ elevations
  • GKC/SBU/3/22/8: (026) alterations to door to Buchanan St
  • GKC/SBU/3/22/9: (017) horizontal storage cabinets/ plan, sections & elevation
  • GKC/SBU/3/22/10: (029) drawer insert to low level sales desks/ plan & sections

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/23/1: (127) shop facade/details: 1/4"-1"
  • GKC/SBU/3/23/2: single diffusers/ shop lighting (revised)
  • GKC/SBU/3/23/3: (81) NE & NW junction with mutual gable: 1/4FS& 1/4"
  • GKC/SBU/3/23/4: (140X) cashiers drawers with fittings/ details (revised): 1/4FS
  • GKC/SBU/3/23/5: (75) door frames/ sectional details: 1/2FS
  • GKC/SBU/3/23/6: (161) security bars/ section & elevations: 1" &FS
  • GKC/SBU/3/23/7: (158) door handle Buchanan St: 1/2"-1'0"& 1/2FS
  • GKC/SBU/3/23/8: (017) details of shopfront: 1"-1'0"
  • GKC/SBU/3/23/9: (021) ticket printer locations (existing): 1:10
  • GKC/SBU/3/23/10: (55D) second floor internal partitions: 1/4"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/24/1: (013) low level sales desk/ plan, sections & elevations
  • GKC/SBU/3/24/2: (141) plan details/ cahier's room: 1/4FS
  • GKC/SBU/3/24/3: (141A) plan details/ cashier's room: 1/4FS
  • GKC/SBU/3/24/4: (140) sections/ cashier's room: 1/4FS
  • GKC/SBU/3/24/5: (148) porch door/ inner door: 1/4 FS & 1/2"
  • GKC/SBU/3/24/6: (011) display wall-sales area first floor/ plan & elevation: 1:20
  • GKC/SBU/3/24/7: (70A) plan & section: 1/4"-1'0"
  • GKC/SBU/3/24/8: detail through wallhead on North Wall
  • GKC/SBU/3/24/9: (03) sections/ minor alterations to 3rd floor offices: 11/2"-1'0"
  • GKC/SBU/3/24/10: (114A) elevations/ facade: 1/4"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/27/1: (31A) locality & site plans: 25"-1mi & 1/16"
  • GKC/SBU/3/27/2: (105R) plans/ facade Gordon Lane: 1/2" & 1/4FS
  • GKC/SBU/3/27/3: (154) sections/ facade Gordon & Mitchell Lanes: 1/2"
  • GKC/SBU/3/27/4: (130) fascia sill/ Mitchell Lane: FS
  • GKC/SBU/3/27/5: (134 additional) detail of grills/ plan & section
  • GKC/SBU/3/27/6: elevations: 1/8"-1'0"
  • GKC/SBU/3/27/7: elevations
  • GKC/SBU/3/27/8: (021) floor plans (proposed)
  • GKC/SBU/3/27/9: ceiling & electrical suspension/layout: 1/4".

MISLAID:

  • GKC/SBU/3/27/: (49A) roof framing/ plan: 1/4" & 3/8"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/28/1: (009) details of dividing wall to stair at ground floor/ section & elevation: 1:50
  • GKC/SBU/3/28/2: (008) plan of escape: 1:20
  • GKC/SBU/3/28/3: (005A) section C-C: 1:50
  • GKC/SBU/3/28/4: (004) section a-a & b-b: 1:50
  • GKC/SBU/3/28/5: (002) ground floor plan/ as existing & as proposed: 1:50
  • GKC/SBU/3/28/6: locality & site plans: 1:200 & 25"=1mi
  • GKC/SBU/3/28/7: ground floor plan/ as existing & as proposed (superseded): 1:50
  • GKC/SBU/3/28/8: 1st floor (as proposed) & 2nd floor/plans: 1:50
  • GKC/SBU/3/28/9: section a-a & b-b (superseded): 1:50
  • GKC/SBU/3/28/10: section c-c (superseded): 1:50
  • GKC/SBU/3/28/11: elevations/ Gordon & Mitchell Lanes: 1:50.

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/41/: (17E) ground floor plans: 1/4"
  • GKC/SBU/3/4/2: original building, front and rear elevations, locality plan and floor plans 1/4"-1'0" and 1/8"-1'0" and 25 = 1mi
  • GKC/SBU/3/4/3: plans, sections & elevation of external cladding: 1/4FS & 1/4"-1'0"
  • GKC/SBU/3/4/4: (112R) key elevations/ facade shop: 1/8"
  • GKC/SBU/3/4/5: flue/details: 3/4"
  • GKC/SBU/3/4/6: (82) wall access panels/ toilets: 11/2"
  • GKC/SBU/3/4/7: ground floor plan: 1/4"-1'0"
  • GKC/SBU/3/4/8: (117) sections/ shop ceiling: 1/2" & 1/4FS
  • GKC/SBU/3/4/9: (28A) slot profiles/ shop ceiling: 1/2"
  • GKC/SBU/3/4/10: (126) worktop fitment/ boadicea room: 1" & 1/4FS

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/7/1: (1) ground floor plan as proposed: 1/50 & 1/100
  • GKC/SBU/3/7/2: (77) external extract from TCU unit: 3/8" & 1/2FS
  • GKC/SBU/3/7/3: (115) ceiling framing/shop: 1/2"
  • GKC/SBU/3/7/4: (007B) revised plan to support slab extension
  • GKC/SBU/3/7/5: (009C) electrical & service alterations
  • GKC/SBU/3/7/6: plan upper level (ground floor): 1/4"
  • GKC/SBU/3/7/7: (74) details/ west stair first floor: 3/8" & 3/4"
  • GKC/SBU/3/7/8: (005) section B-B (existing)
  • GKC/SBU/3/7/9: (008c) section B-B (proposed)
  • GKC/SBU/3/7/10: (125) porch/ Mitchell Lane: 1/2"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/10/1: (78C) 1st & 2nd floor cupboards: 3/8"
  • GKC/SBU/3/10/2: (006) basement & ground floor plans (proposed)
  • GKC/SBU/3/10/3: (012) locality & site plans
  • GKC/SBU/3/10/4: (011) proposed elevation/Mitchell Lane & Gordon Lane
  • GKC/SBU/3/10/5: (010) plan of screen infill panel & elevations
  • GKC/SBU/3/10/6: (009) electrical & service alterations
  • GKC/SBU/3/10/7: (008) section B-B (proposed)
  • GKC/SBU/3/10/8: (007) section A-A & basement stair (proposed)
  • GKC/SBU/3/10/9: (1/006) proposed display units/ elevations, section & details
  • GKC/SBU/3/10/10: (005) section B-B (existing)

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/18/1: (97A) handrail west stair/section: 3/8"
  • GKC/SBU/3/18/2: (016) proposed vertical louvre drapes 1st floor sales area/ plan, section & elevations: 1:20 & 1:2
  • GKC/SBU/3/18/3: handrail west stair/ plan & section: 3/8"
  • GKC/SBU/3/18/4: (019) proposed female staff cloak room/ 1st floor: 1:20
  • GKC/SBU/3/18/5: (010) ground floor/ glazed screen (proposed alterations)
  • GKC/SBU/3/18/6: (012) screen details/ first floor
  • GKC/SBU/3/18/7: (015A) electrical, computer & gpo installations/ ground & 1st floors: 1:50
  • GKC/SBU/3/18/8: (007B) suspended ceiling & lighting layout (proposed alterations): 1:50
  • GKC/SBU/3/18/9: (73) details/ west stair second floor: 3/8" & 3/4"
  • GKC/SBU/3/18/10: (94) 1st & 2nd floor electrical cupboard/ section & elevation: 1/8FS & 3/4"-1'0"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/19/1: (20E) long sect: 1/4"
  • GKC/SBU/3/19/2: (022) ticket printer location (proposed)/ plan & elevations: 1:10
  • GKC/SBU/3/19/3: (027) proposed display unit/ elevation, sections & details
  • GKC/SBU/3/19/4: (006) elevations/ Gordon & Mitchell Lanes: 1:50
  • GKC/SBU/3/19/5: (024) plan of proposed floor slab: 1:20
  • GKC/SBU/3/19/6: section
  • GKC/SBU/3/19/7: (008) plan of escape: 1:20
  • GKC/SBU/3/19/8: (1/004) ticket drawer/ section A-A & B-B
  • GKC/SBU/3/19/9: (1/005) brochure rack details/ section & elevation.
  • GKC/SBU/3/19/10: sections thro' glass front: 1"-1'0"

*Not available / given

Drawings & Plans: BOAC Offices, Buchanan St, Glasgow

Folder contains:

  • GKC/SBU/3/25/1: (1/007) proposed high level sales desk to match existing/ plan, section & elevations: 1:10
  • GKC/SBU/3/25/2: (113R) mullion/ plans, section & elevation: 1/4FS
  • GKC/SBU/3/25/3: (85B) sections/ external wall: 1/4FS
  • GKC/SBU/3/25/4: (001) proposed alterations/ locality & site plans: 25"=1mi & 1:200
  • GKC/SBU/3/25/5: (48) cladding details: 1/4FS
  • GKC/SBU/3/25/6: (156B) ground floor/ letter box: 1/4"-1'0" & 1/4FS
  • GKC/SBU/3/25/7: (84) plan, details & elevation: exterior wall: 1/4FS & 3/8"
  • GKC/SBU/3/25/8: (157) mid floor toilets/ shelves: 1/4FS & 1/2"-1'0".
  • GKC/SBU/3/25/9: (122) details/ internal elevations staircases: 3/8"-1'0" & 1/2"-1'0"
  • GKC/SBU/3/25/10: (123) framing/shop facade: 1/4"

*Not available / given

Drawings & Plans: Boiler House, Elderslie

Folder contains:

  • GKC/BHEL/3/2/1: (16) section A-A: 3/8"
  • GKC/BHEL/3/2/2: (17) external door: 1/4 fs detail
  • GKC/BHEL/3/2/3: (22) concrete cope: detail
  • GKC/BHEL/3/2/4: (25) junction of decking at column: detail
  • GKC/BHEL/3/2/5: (26) office and WC: 1/2" details

Tube contains:

  • GKC/BHEL/3/2/6: (017) patent glazing: fs detail.

*Not available / given

Drawings & Plans: Boiler House, Elderslie

Folder contains:

  • GKC/BHEL/3/1/1: (4) layout plan: 1"-64'
  • GKC/BHEL/3/1/2: (10A2) floor slabs: 3/8" plan and sections
  • GKC/BHEL/3/1/3: (15) brickwork: 1/4" plan
  • GKC/BHEL/3/1/4: (18) plans, sections, and elevations: 1/8"
  • GKC/BHEL/3/1/5: (23) plan and sections: 1/4"
  • GKC/BHEL/3/1/7: (26) windows and door to gas cylinder store: 1/4" details
  • GKC/BHEL/3/1/8: (12A) plan and sections showing amount of digging required: 1/8"
  • GKC/BHEL/3/1/9: (14) detail: 1/4 fs
  • GKC/BHEL/3/1/10: (15) plan: 3/8".

Tube contains:

  • GKC/BHEL/3/1/6: (24) elevations: 1/4"

*Not available / given

Drawings & Plans: Bonar Hall, University of Dundee

Folder contains:

  • GKC/HT-DU/3/11/1: (100) section thro' NE corner: 1:25
  • GKC/HT-DU/3/11/2: (083) longitudinal sections thro' drains: 1:100
  • GKC/HT-DU/3/11/3: (096) section thro' SE corner: 1:50 & 1:25
  • GKC/HT-DU/3/11/4: (136) brickwork expansion joints: 1:100
  • GKC/HT-DU/3/11/5: (078A) gallery rooflighting/ plans & sections: 1:100, 1:25 & 1:5
  • GKC/HT-DU/3/11/6: (074A) glazed external screens: 1:5
  • GKC/HT-DU/3/11/7: (138) DPC & tanking details south & southwest corner: 1:25
  • GKC/HT-DU/3/11/8: plans, sections & elevations
  • GKC/HT-DU/3/11/9: (086A) senate room/ clerestorey windows: 1:5 & 1:25
  • GKC/HT-DU/3/11/10: (093) plan of stage: 1:100

*Not available / given

Drawings & Plans: Bonar Hall, University of Dundee

Folder contains:

  • GKC/HT-DU/3/16/1: (024B) proposed building superimposed on site survey plan: 1:200
  • GKC/HT-DU/3/16/2: (157) isometric view of hall: 1:50
  • GKC/HT-DU/3/16/3: (217) details/ internal steel handrails: FS
  • GKC/HT-DU/3/16/4: (106) plan & sections of transformer room: 1:50 & 1:25
  • GKC/HT-DU/3/16/5: part elevation of beam C1
  • GKC/HT-DU/3/16/6: (135) brickwork elevation: 1:100
  • GKC/HT-DU/3/16/7: (220) plan, section & elevations/ door 28 south entrance
  • GKC/HT-DU/3/16/8: (137) brickwork expansion joints: 1:100
  • GKC/HT-DU/3/16/9: (235C) plan/ senate room ceiling: 1:50
  • GKC/HT-DU/3/16/10: (123C) drainage/northeast corner: 1:20 & 1:50

*Not available / given

Drawings & Plans: Bonar Hall, University of Dundee

Folder contains:

  • GKC/HT-DU/3/18/1: (084) internal drainage/ main lavs: 1:25
  • GKC/HT-DU/3/18/2: (249) details/ metal capping at wallhead: 1:5
  • GKC/HT-DU/3/18/3: (130) manhole details: 1:50 & 1:20
  • GKC/HT-DU/3/18/4: detail sections: 1:5
  • GKC/HT-DU/3/18/5: elevation to Park Pl & sections: 1:5
  • GKC/HT-DU/3/18/6: glazed external screen details: 1:5
  • GKC/HT-DU/3/18/7: details/ east side foyer exit: 1:25
  • GKC/HT-DU/3/18/8: (142D) plan/ NE corner ground floor: 1:50 & 1:25
  • GKC/HT-DU/3/18/9: (239) wallheads/ sections & details: 1:10.
  • GKC/HT-DU/3/18/10: (199C) timber steps & heaters/ east gallery: 1:25
  • GKC/HT-DU/3/18/11: (134) tanking details/ lan: 1:100
  • GKC/HT-DU/3/18/12: (247) details/ heater grilles in block walls L&F: 1:5 & FS

*Not available / given

Results 201 to 250 of 1821