Showing 1387 results

Archival description
Records of Gillespie, Kidd and Coia Architects Folder
Print preview View:

Drawings & Plans: Taoiseach's Residence and State Guest House, Phoenix Park, Dublin

Folder contains:

  • GKC/TA-RE/3/1/1: sketch perspectives
  • GKC/TA-RE/3/1/2: perspectives [as previous] and axonometric view of site
  • GKC/TA-RE/3/1/3: plans and elevations
  • GKC/TA-RE/3/1/4: presentation drawing [on card] showing elevations
  • GKC/TA-RE/3/1/5: elevations
  • GKC/TA-RE/3/1/8: plans and elevations (duplicate of GKC/TA-RE/3/1/3)

PRESENTATION DRAWINGS (mounted on card):

  • GKC/TA-RE/3/1/6: 'concept and organisation', showing design concept
  • GKC/TA-RE/3/1/7: axonometric site plan, perspective showing entrance to Taoiseach's residence, and perspectives of site looking towards residences

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/9/1: (76R2) layout of columns
  • GKC/SSP/3/9/2: (73R) details of cloak fittings in corridors
  • GKC/SSP/3/9/3: (77R) timber window frames:sections
  • GKC/SSP/3/9/4: (78) boys toilet MH plan & sections
  • GKC/SSP/3/9/5: (80R) details of MS stanchions showing top & base fixings
  • GKC/SSP/3/9/6: (83) details of conc. slab at court
  • GKC/SSP/3/9/7: (84R) wallhead details: plan & section
  • GKC/SSP/3/9/8: (81) typical section thro' classroom
  • GKC/SSP/3/9/9: (82) details of electrical service duct:plan & sect

Tube contains:

  • GKC/SSP/3/9/10: (74) rainwater disposal from roofs: 1/8"=1'0"

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/8/1: (72A) layout of conc. gutter: 1/4"=1'0"
  • GKC/SSP/3/8/2: (72B) layout of conc. gutter: 1/4"=1'0
  • GKC/SSP/3/8/3: (71) locality plan: 1/2500
  • GKC/SSP/3/8/4: (68) timber canopy: plan, sect & elev
  • GKC/SSP/3/8/5: (6B) layout of grooves in conc. at gullies:1"-1'0"
  • GKC/SSP/3/8/6: (67R2) cold water storage tank: plan, sect & elev
  • GKC/SSP/3/8/7: (68A) entrance canopies/ details
  • GKC/SSP/3/8/8: (68R) entrance canopies: 1/8"-1'0"
  • GKC/SSP/3/8/9: (68R) entrance canopies: 1/8"-1'0"
  • GKC/SSP/3/8/10: (73) details of box bench beams in lower roof

Tube contains:

  • GKC/SSP/3/8/11: (70R3) plan & details of fascia

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/7/1: (64R1) medical suite roof & cloaks adjacent:1/2"=1'0"
  • GKC/SSP/3/7/2: (66) kitchen layout: 1/4"=1'0"
  • GKC/SSP/3/7/3: (65) details of flue pipes for sanitary incinerators:1/2FS
  • GKC/SSP/3/7/4: (63R) kitchen compound: location plan & section
  • GKC/SSP/3/7/5: (63R1) kitchen compound:plan, sect, elev & detail
  • GKC/SSP/3/7/6: (67R) water storage tank: 1/4"-1'0"
  • GKC/SSP/3/7/7: (67B) water tank/ access rungs: detail &sect
  • GKC/SSP/3/7/8: (67A) coldwater storage tank/cladding details:1/4FS
  • GKC/SSP/3/7/9: (65R1) amended sink support: plan, sect & elev
  • GKC/SSP/3/7/10: (65R) classroom sink recess: 1 1/2" =1'0"
  • GKC/SSP/3/7/11: (65) assembly and dining hall doors

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/6/1: (58) details of side panels type 'c' doors
  • GKC/SSP/3/6/2: (59) details of lined timber doors type 'c'
  • GKC/SSP/3/6/3: (61R1) gymnasium/roof & cladding details
  • GKC/SSP/3/6/4: (57) details of sliding doors at showers
  • GKC/SSP/3/6/5: (56R) conc. filling to drain at canopy foundations
  • GKC/SSP/3/6/6: (56) foundations & roof plans:1/8
  • GKC/SSP/3/6/7: (52) elevations: 1/8"
  • GKC/SSP/3/6/8: (53) layout of door mats
  • GKC/SSP/3/6/9: (55) door details at milk store
  • GKC/SSP/3/6/10: (54) landscape work at entrances: 1/8" -1'0"

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/5/1: (49R) elevations of vestibule screens
  • GKC/SSP/3/5/2: (50) general plans/sections:1/8"
  • GKC/SSP/3/5/3: (44R) kitchen fitments: 1/2"=1'0"
  • GKC/SSP/3/5/4: (52) details at steps to stage
  • GKC/SSP/3/5/5: (46) single action door checks: full size
  • GKC/SSP/3/5/6: (48) transomes over vestibule screens: 1/4FS
  • GKC/SSP/3/5/7: (44B) kitchen store shelves: 1/4FS
  • GKC/SSP/3/5/8: (41R1) details-vestibule & screen doors
  • GKC/SSP/3/5/9: (42) details & elevation of entrance doors at kitchen
  • GKC/SSP/3/5/10: (43R1) vestibule doors & screens: details at brick jambs, floor & soffits

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/4/1: (36) changing rooms/bench seats: 1/2 =1'0" & 1/4FS
  • GKC/SSP/3/4/2: (31) details of louvres at cold room: 1 1/2" -1'0" &FS
  • GKC/SSP/3/4/3: (30) details of sliding doors at stage:1"-1'0" & 1/2FS
  • GKC/SSP/3/4/4: (41) details of entrance & vestibule doors: 1" to 1'-0" &HFS
  • GKC/SSP/3/4/5: (28R) details of window openings: 1"=1'0"
  • GKC/SSP/3/4/6: (38) plywood sills to windows in classrooms & admin: 1/2FS
  • GKC/SSP/3/4/7: (28R2) details of window openings (revised): 1"-1'-0"
  • GKC/SSP/3/4/8: (27) vestibule screens/details: full size
  • GKC/SSP/3/4/9: (26) details of classroom french windows: scale 1" to 1'0" & HFS
  • GKC/SSP/3/4/10: (26) classrooms MH 1,2,3,4,5,6 & PH 1&3 details at French windows: full size

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/3/1: (23) details of classroom doors: 1" to 1'0" & HFS
  • GKC/SSP/3/3/2: (22R1) servery hatch doors & adjacent cupboards: 1/2" =1'0" &1/2F.S.
  • GKC/SSP/3/3/3: (24) details at gym store door (no.104):1/2" =1'0" &1/2F.S.
  • GKC/SSP/3/3/4: (23R) details/ typical classroom door: 1"=1'0" &FS
  • GKC/SSP/3/3/5: (24A) tiled through in 'sprays': 1/4" & 1/4FS
  • GKC/SSP/3/3/6: (18KR) partitions & tiling to showers: 1/2" =1'0" & 1/4F.S.
  • GKC/SSP/3/3/7: (19) details of stage in assembly hall: 1/4" to 1'0"
  • GKC/SSP/3/3/8: (19R1) details of stage/assembly/dining hall: 1/4" & 1/2" =1'0" &1/2F.S.
  • GKC/SSP/3/3/9: (25) medical suite door details: 12 to 1'0" & HFS

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/2/1: (14) ground sections: 1/16"
  • GKC/SSP/3/2/2: (18A) M.H. boys toilet: 3/4"-1'0"
  • GKC/SSP/3/2/3: (18B) boys toilet/kitchen area: 3/4"-1'0"
  • GKC/SSP/3/2/4: (18C) P.H. boys toilet: 3/4"-1'0"
  • GKC/SSP/3/2/5: (18D) P.H. girls toilet: 3/4"-1'0"
  • GKC/SSP/3/2/6: (18E) girls toilet/admin area: 3/4"-1'0"
  • GKC/SSP/3/2/7: (18F) M.H. girls toilet: 3/4"-1'0"
  • GKC/SSP/3/2/8: (18G) staff toilet: 3/4"-1'0"
  • GKC/SSP/3/2/9: (18H) headmaster's toilet: 3/4"-1'0"

Tube contains:

  • GKC/SSP/3/2/10: (17R) detail plans of brickwork: 1/4"-1-'0"
  • GKC/SSP/3/2/11: (17) detail plans of brickwork: 1/4"-1-'0"
  • GKC/SSP/3/2/12: (17A) detail plans of brickwork: 1/4"-1'0"

Drawings & Plans: Howford Special School Pollok

Folder contains

  • GKC/SSP/3/19/1: (143) kitchen fitments/ details: FS & 1/4FS
  • GKC/SSP/3/19/2: (R2) proposed amendment at assembly/dining hall:1/8"=1'0"
  • GKC/SSP/3/19/3: (R3) proposed amendment at assembly/dining hall:1/4"=1'0"
  • GKC/SSP/3/19/4: steps under stage: 11/2"=1'0"
  • GKC/SSP/3/19/5: in situ external sills at clerestorey:1/4FS
  • GKC/SSP/3/19/6: details of D.A. & S.A. springs
  • GKC/SSP/3/19/7: loudspeaker fixings: 1"=1'0"
  • GKC/SSP/3/19/8: framing in cupboard at ass/dining hall: 1/2"=1'0" & 1/4FS
  • GKC/SSP/3/19/9: revised ply girder/2: 1"=1'0"
  • GKC/SSP/3/19/10: floor construction at gym & ass/dining hall: 1/2"=1'0"
  • GKC/SSP/3/19/11: sewer plan

*Not available / given

Drawings & Plans: Howford Special School Pollok

Folder contains

  • GKC/SSP/3/18/1: waste & vent pipes in gym changing: 1/4"
  • GKC/SSP/3/18/2: plan of walls
  • GKC/SSP/3/18/3: plan of kitchen: 1/4"
  • GKC/SSP/3/18/4: proposed revised supporting column detail at ass/dining hall: 1"=1'0"
  • GKC/SSP/3/18/5: vertical relationship of girder components: 1"-1'0"
  • GKC/SSP/3/18/6: detail, plan, section of partitions: 1/2 FS
  • GKC/SSP/3/18/7: locker fitting in cloak space/admin area: 1"=1'0", 1/4FS &FS
  • GKC/SSP/3/18/8: fabrication drawing for water tower: 4 feet to 1 inch
  • GKC/SSP/3/18/9: detail of high level window operator;

Tube 32, Roll 10 contains

  • GKC/SSP/3/18/10: house/ perhaps janitor's

Drawings & Plans: Howford Special School Pollok

Folder contains

  • GKC/SSP/3/17/1: elevations of screens & doors
  • GKC/SSP/3/17/2: cross sections 6&7:1/4"
  • GKC/SSP/3/17/3: proposed janitor's house/ plan, sects & elevations: 1/8"
  • GKC/SSP/3/17/4: elevs of doors/ironmongery: 1/2"-1'0"
  • GKC/SSP/3/17/5: details of amended elevs: 1"=1'0"
  • GKC/SSP/3/17/6: plan showing position of levels: 1:500
  • GKC/SSP/3/17/7: gym/ hinged panel at window control operator: 1/4FS &FS
  • GKC/SSP/3/17/8: windows chart 2/ gym, assembly/dining hall & medical suite
  • GKC/SSP/3/17/9: D/A & S/A floor springs at vestibule doors & screens: FS
  • GKC/SSP/3/17/10: position of door frames at classroom cupboards: 1/2FS

*Not available / given

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/16/1: (144) vegetable & dry goods store/ sparred & plain shelving: 1"=1'0"
  • GKC/SSP/3/16/2: (145R) kitchen/ timber: 1"=1'0" & FS
  • GKC/SSP/3/16/3: (146) medical suite/ sink & footbath:1"=1'0"
  • GKC/SSP/3/16/4: (147) water tank/ pipe ducts: 1"=1'0"
  • GKC/SSP/3/16/5: (148R) staff fitment: 1"=1'0" & 1/4FS
  • GKC/SSP/3/16/6: (149) switch room/duct cover: 1/4FS
  • GKC/SSP/3/16/7: (150) staff room/ panelled wall: 1/2" 1"=1'0" & 1/4FS
  • GKC/SSP/3/16/8: (151) teak pads at two-leaf doors: 1/2FS
  • GKC/SSP/3/16/9: (152) assembly/dining hall/ oP plate at ceiling: 1/4"=1'0" & FS

Tube contains:

  • GKC/SSP/3/16/10: site plan 1:500 & locality plan 1:1250

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/15/1: (140) admin details of finishings/sheet 2: 1/4 FS
  • GKC/SSP/3/15/2: (134R1) kitchen/ detailed plan: 1/2"=1'0"
  • GKC/SSP/3/15/3: (133) revised position of cleaners' sink from switch room: 3/4"-1'0"
  • GKC/SSP/3/15/4: (135R) kitchen/sections:1/2"=1'0"
  • GKC/SSP/3/15/5: (136) admin details of finishings:1/4 FS
  • GKC/SSP/3/15/6: (138) details of doors at court: 1"-1'0" & FS
  • GKC/SSP/3/15/7: (139) detail of gym doors:1"-1'0" & FS
  • GKC/SSP/3/15/8: (141) servery counter unit/fitment 1: 1"-1'0"
  • GKC/SSP/3/15/9: (142) kitchen fitments 2,3,4: 1"-1'0"
  • GKC/SSP/3/15/10: (137) details of wc doors & mirrors: 1/4FS & 1"-1'0"

*Not available / given

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/14/1: (129) finishings/ gym instructor's room: plans & sects
  • GKC/SSP/3/14/2: (127 or 126A) infill panels/ detail sheet A: 1/2FS
  • GKC/SSP/3/14/3: (127BR) medical suite/ details: 1/2FS& 1/4FS
  • GKC/SSP/3/14/4: (126R or 6A) transverse joints in conc. play areas
  • GKC/SSP/3/14/5: (127A) medical suite/ sections:1/2"=1'0"
  • GKC/SSP/3/14/6: (127R) medical suite/ infill panels & partitions:1/2"=1'0"
  • GKC/SSP/3/14/7: (128R) french windows/ details
  • GKC/SSP/3/14/8: (130) classrooms PH2 & 4/ details at french windows: FS & 1/2"=1'0"
  • GKC/SSP/3/14/9: (131) details of glazed screens at court: 1/2FS
  • GKC/SSP/3/14/10: (132) details of unique blackboard unit: 1 1/2"-1/0" & 1/2FS

*Not available / given

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/13/1: (117) administration suite/partitions:1/2" & 1 1/2"=1'0"
  • GKC/SSP/3/13/2: (118) administration suite/ finishings, sheet 1:1/2"=1'0"
  • GKC/SSP/3/13/3: (126) infill panels between laminated posts/ sheet 1: plans & sections
  • GKC/SSP/3/13/4: (120) FS details/ corridor cupboards: grid lines 5 & 49
  • GKC/SSP/3/13/5: (125) door jambs at facing brick openings: FS details
  • GKC/SSP/3/13/6: (124) details of doors/ types A&B: 1'=1'0" & FS
  • GKC/SSP/3/13/7: (123) showers: stud partitions/ plan, sects & details
  • GKC/SSP/3/13/8: (122) details of corridor cupboards/ grid 49
  • GKC/SSP/3/13/9: (121) details of corridor cupboards/ grid 5
  • GKC/SSP/3/13/10: (119) administration suite/ finishings, sheet 2:1/2"=1'0"

*Not available / given

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/12/1: (112) assembly/dining hall: roof & cladding details
  • GKC/SSP/3/12/2: (116) typical classroom grounds & finishes:1/2"=1'0"
  • GKC/SSP/3/12/3: (115) details/ roof & cladding medical suite:1/4FS
  • GKC/SSP/3/12/4: (107) rooflights detail sheet 2: 1/4FS
  • GKC/SSP/3/12/5: (106) rooflights details sheet 1: 1"=1'0"
  • GKC/SSP/3/12/6: (104R) roof joists at cloaks & corridor at PH: 1/2"=1'0"
  • GKC/SSP/3/12/7: (111) metal inserts at rooflights:1/2"=1'0"
  • GKC/SSP/3/12/8: (110) stainless steel sink units/ overall sizes: 1/2"=1'0"
  • GKC/SSP/3/12/9: (109R) lead capping to facias: FS
  • GKC/SSP/3/12/10: (108) rooflights detail sheet 3:FS

*Not available / given

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/11/1: (100) gym: timber carcassing: 1"=1'0"
  • GKC/SSP/3/11/2: (101R) details/ roof & cladding, gym & assembly hall: 1/4FS
  • GKC/SSP/3/11/3: (101A) proposed girder bracing: 1/4FS
  • GKC/SSP/3/11/4: (103R) layout of roof joists at showers etc & cloaks area: 1/2"=1'0"
  • GKC/SSP/3/11/5: (102R) gym, assembly/dining hall & medical suite: red pine cover plates, sills etc at gym:FS
  • GKC/SSP/3/11/6: (98) details of rainwater heads: 1/4FS
  • GKC/SSP/3/11/7: (97) details of rainwater outlets & vent pipes at gutter: 1/4FS
  • GKC/SSP/3/11/8: (95R) typical classroom cupboards & finishings: sects & elevs
  • GKC/SSP/3/11/9: (96R) FS details doors & cupboards to classrooms

Tube contains:

  • GKC/SSP/3/11/10: (99) revised layout of box ply beams: 1/8"-1'0"

Drawings & Plans: Howford Special School Pollok

Folder contains:

  • GKC/SSP/3/10/1: (90) details of roofs over vestibules
  • GKC/SSP/3/10/2: (89C&D) clerestorey windows/ end vestibules: 3/4"-1'0"
  • GKC/SSP/3/10/3: (94) coldroom/space allocation: plan & sections
  • GKC/SSP/3/10/4: (89A) clerestorey windows vestibule: 3/4"-1'0"
  • GKC/SSP/3/10/5: (89E&F) clerestorey windows/vestibules: 3/4"-1'0"
  • GKC/SSP/3/10/6: (89B) clerestorey windows/ junction store & kitchen: 3/4"-1'0"
  • GKC/SSP/3/10/7: (89G) clerestorey windows/vestibules: 3/4"-1'0"
  • GKC/SSP/3/10/8: (91) sections thro' posts & cover plates:FS
  • GKC/SSP/3/10/9: (92R) details of rooflight over kitchen: plan, sect & elev
  • GKC/SSP/3/10/10: (93) gas meter cupboard: 1/2"-1'0"

*Not available / given

Drawings & Plans: Howford Special School Pollock

Folder contains:

  • GKC/SSP/3/1/1: (1R2) site plan: 1-500
  • GKC/SSP/3/1/2: (10R) sections/revised: 1/8"
  • GKC/SSP/3/1/3: (1) site plan: scale 1/32"
  • GKC/SSP/3/1/4: (4R) ground floor slab: 1/8"=1'0"
  • GKC/SSP/3/1/5: (12) details of precast lintels & mullions: 1"=1'0
  • GKC/SSP/3/1/6: (9R) elevations: 1/8"-1'-0"
  • GKC/SSP/3/1/7: (3) key drawings, plan and sections: 1/16"
  • GKC/SSP/3/1/8: (2) plan: scale 1/16"=1'0"

Tube contains:

  • GKC/SSP/3/1/9: (11R) layout of roof beams & joists: 1/8"
  • GKC/SSP/3/1/10: (6R1) foundation plan: 1/8" & 1/2"=1'0"
  • GKC/SSP/3/1/11: (5R) plan/general:1/8"=1'0"

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/9/1: (102a) assembly hall steps details & heater units
  • GKC/SSF/3/9/2: (100/4) proposed additions for school
  • GKC/SSF/3/9/3: (98) cloakroom, toilet & changing fitments: scale 1"=1'-0" & 1/4 fs
  • GKC/SSF/3/9/4: (100) details of conc. water tank
  • GKC/SSF/3/9/5: (99a) details of heating cupboards & shower cubicles in changing room
  • GKC/SSF/3/9/6: (96D) plan & elevations at corner post
  • GKC/SSF/3/9/7: (103) door head details: scale full size.
  • GKC/SSF/3/9/8: (99) 2nd & 3rd floor windows
  • GKC/SSF/3/9/9: (97) door details: scale full size
  • GKC/SSF/3/9/10: (96) external railings & internal semi-circular stairway

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/8/1: (94) details of doors & windows to main entrance
  • GKC/SSF/3/8/2: (93) half full size wndows/details: timber
  • GKC/SSF/3/8/3: (89a) new layout to existing boilerhouse
  • GKC/SSF/3/8/4: (93a) full size details: basement metal windows
  • GKC/SSF/3/8/5: (101) laminated timber beams
  • GKC/SSF/3/8/6: (94a) concrete sill detail: scale 1/4 full-size
  • GKC/SSF/3/8/7: (89a) new layout to existing boilerhouse/ sections thro' ducts under playground
  • GKC/SSF/3/8/8: (94A) entrance stairway/patent glazing details
  • GKC/SSF/3/8/9: (95a) concrete column details
  • GKC/SSF/3/8/10: (90a) plan of pipe duct

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/7/1: (88a) precast concrete cill units.
  • GKC/SSF/3/7/2: (87) radiator & hosereel recess details
  • GKC/SSF/3/7/3: (81a) plan of door 57 to 1/4 FS
  • GKC/SSF/3/7/4: (80) details of secondary entrance & staff room timber screen: scale 1"=1'-0
  • GKC/SSF/3/7/5: (78a) window schedule no. 2
  • GKC/SSF/3/7/6: (80a) entrance grille mats: plan,sect & elev
  • GKC/SSF/3/7/7: (85) concrete beam details: scale 1/8 full size
  • GKC/SSF/3/7/8: (79) door schedule 1: scale 1"=1'-0"
  • GKC/SSF/3/7/9: (75a) window schedule no.1: scale 1/2"=1'0"
  • GKC/SSF/3/7/10: (76) window schedule no. 3: scale 1/2"=1'0"

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/6/1: (68) roof plan of classroom block: scale 1/4"
  • GKC/SSF/3/6/2: (67a) details of access bridge & ass. roof gutter details
  • GKC/SSF/3/6/3: (64) section 5: scale 1/4"
  • GKC/SSF/3/6/4: (63) section 4: scale 1/4" =1'-0"
  • GKC/SSF/3/6/5: (65) section 6: scale 1/4"
  • GKC/SSF/3/6/6: (73a) high level windows over assembly hall & gymnasium: scale 1/8th F.6
  • GKC/SSF/3/6/7: (69) stairway no.1: scale 1/2"=1'-0"
  • GKC/SSF/3/6/8: (74a) detail of access stairway to existing school building.
  • GKC/SSF/3/6/9: (70a) first floor plan showing high level window arrangement
  • GKC/SSF/3/6/10: (72a) 1/2" plan & section thro' main entrance

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/5/1: (62) section 3: scale 1/4"=1'-0"
  • GKC/SSF/3/5/2: (56) fitments in library & reading room
  • GKC/SSF/3/5/3: (61) section 2: scale 1/4"
  • GKC/SSF/3/5/4: (57) main entrance door & door to south elevation
  • GKC/SSF/3/5/5: (59) domestic science fitments
  • GKC/SSF/3/5/6: (55) stairway plans & details
  • GKC/SSF/3/5/7: (54) section/stairway 2
  • GKC/SSF/3/5/8: (50a) window details to stairway 1 & to gym: scale 1/8" full size

Tube contains:

  • GKC/SSF/3/5/9: (49a) fitments/ library, medical, dressing & instructors' rooms

MISLAID

  • (60) section 1: scale 1/4"

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/4/1: (42) details of windows on first & ground floors: scale 1/8" f.s.
  • GKC/SSF/3/4/2: (43) ground floor changing room
  • GKC/SSF/3/4/3: (41a) elevations to shower fitments
  • GKC/SSF/3/4/4: (44) basement changing & cloaks layout
  • GKC/SSF/3/4/5: (44) basement changing and cloakroom plan.
  • GKC/SSF/3/4/6: (43a) ground floor changing room
  • GKC/SSF/3/4/7: (41) elevations showing adjoining T.A. hall: scale 1/8"
  • GKC/SSF/3/4/8: (46) cloakroom, toilet & changing fittings
  • GKC/SSF/3/4/9: (48) fitments/ cookery & needlework: scale 1/2"
  • GKC/SSF/3/4/10: (47) fitments/ science rooms: full size

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/3/1: (35) door schedule: scale 1"
  • GKC/SSF/3/3/2: (40) fitments/ science rooms: scale 1/2".
  • GKC/SSF/3/3/3: (39a) details of windows/ 2nd & 3rd floors: scale 1/8 f.s.
  • GKC/SSF/3/3/4: (38) door details
  • GKC/SSF/3/3/5: (37a) transome light schedule: scale 1"
  • GKC/SSF/3/3/6: (36) door frame: full size
  • GKC/SSF/3/3/7: (34) door frames: scale full size

Tube contains:

  • GKC/SSF/3/3/8: (33) door frames: full size
  • GKC/SSF/3/3/9: (36A) details of doors in gym store

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/2/1: (26) site plans: scale 1/16", 1/1250"
  • GKC/SSF/3/2/2: (27) elevations: scale 1/8"
  • GKC/SSF/3/2/3: elevations/window opening schedule: scale 1/8"
  • GKC/SSF/3/2/4: (5) key sections/ sects 1,2,3 & 4: scale 1/16"
  • GKC/SSF/3/2/5: (25) section 7: scale 1/4"
  • GKC/SSF/3/2/6: (29) ground floor plan: scale 1/4"
  • GKC/SSF/3/2/7: (32) third floor plan: scale 1/4"=1'-0".
  • GKC/SSF/3/2/8: (31) second floor plan: scale 1/4"
  • GKC/SSF/3/2/9: (30) first floor plan: scale 1/4"
  • GKC/SSF/3/2/10: (28a) basement plan: scale 1/4"

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/19/1: (11/1920) ground & upper floor plans of existing school
  • GKC/SSF/3/19/2: (11/1920) ground & upper floor plans of existing school (copy)
  • GKC/SSF/3/19/3: concrete column & beam details
  • GKC/SSF/3/19/4: detail of rooflight & hood over demonstration bench
  • GKC/SSF/3/19/5: homecraft bedroom cupboards & flat store: plan, sect & elevs
  • GKC/SSF/3/19/6: island bookshelves for library: plan, sect, elev & details
  • GKC/SSF/3/19/7: basement & ground floor plans
  • GKC/SSF/3/19/8: locality plan
  • GKC/SSF/3/19/9: (1) key plans: 1/16"
  • GKC/SSF/3/19/10: (11/1920) block plan

Tube contains:
FOLLOWING MATERIAL OSTENSIBLY FROM IZI METZSTEIN COLLECTION:

  • GKC/SSF/3/19/11: plans and sections, coloured ['teaching material']

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/18/1: prelim plans of assembly hall & classrooms
  • GKC/SSF/3/18/2: proposed reinstatement of north gable of existing classroom wing
  • GKC/SSF/3/18/3: brickwork: details at stage & music room
  • GKC/SSF/3/18/4: proposed broom cupboard & storage unit in homecraft flat store: scale 1"=1'0"
  • GKC/SSF/3/18/5: island bookshelves for library 1"=1'0"
  • GKC/SSF/3/18/6: (P10) 3rd floor plan/preliminary structure & brickwork
  • GKC/SSF/3/18/7: (P9) 2nd floor plan/preliminary structure & brickwork: scale 1/8"
  • GKC/SSF/3/18/8: (11/1920) 1st & 2nd floor plans
  • GKC/SSF/3/18/9: (11/1920) front & back elevs and cross & longitudinal sects
  • GKC/SSF/3/18/10: (11/1920) basement & ground floor plans

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/17/1: (P6) basement plan/ preliminary structure & brickwork: scale 1/8"
  • GKC/SSF/3/17/2: (NO27) typical section thro' external wall at ground, 1st & 2nd floor levels: scale 1/2" =1'0"
  • GKC/SSF/3/17/3: (NO 93) plan & sect: lower ground floor level: 305-50
  • GKC/SSF/3/17/4: (NO92) plans & sects: ground floor & upper mezzanine floor levels
  • GKC/SSF/3/17/5: (L17) 2nd & 3rd floor plans/preliminary layout: scale 1/8"
  • GKC/SSF/3/17/6: (L16) first floor plan/preliminary layout: scale 1/8"
  • GKC/SSF/3/17/7: (L15) ground floor plan/preliminary layout: scale: 1/8"
  • GKC/SSF/3/17/8: (P7) ground floor plan/ preliminary structure & brickwork: scale 1/8"
  • GKC/SSF/3/17/9: (P8) first floor plan/ preliminary structure & brickwork: scale 1/8".

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/16/1: (G63) cloakroom fittings: elevs
  • GKC/SSF/3/16/2: (202/L14) basement plan/preliminary layout: scale: 1/8"
  • GKC/SSF/3/16/3: (110c) cookery/laundry draining boards
  • GKC/SSF/3/16/4: (111c) cookery room: projecting work top unit
  • GKC/SSF/3/16/5: (96c) proposed guard rail at main entrance
  • GKC/SSF/3/16/6: (29GL) proposed gymnasium layout: scale 1/4"= 1'0"
  • GKC/SSF/3/16/7: (128d) stage curtain pelmet & window suspension details: elev & sect
  • GKC/SSF/3/16/8: (134c) magazine storage trolleys & framed supports: plan, sect & elev
  • GKC/SSF/3/16/9: (128c) details of suspension system at stage

Tube contains:

  • GKC/SSF/3/16/10: (134c) magazine storage trolleys & framed supports: plan, sect & elev

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/15/1: (HC3) heating chamber general: 1/4" details
  • GKC/SSF/3/15/2: (BW1) sectional elevation from Lanark St.
  • GKC/SSF/3/15/3: (102b) assembly hall steps & stage front details
  • GKC/SSF/3/15/4: (128b) suspended ceiling over stage/assembly hall: scale 1/4" =1'0"
  • GKC/SSF/3/15/5: (100/3) plan of proposed additions
  • GKC/SSF/3/15/6: (110b) cookery/laundry: range of sinks
  • GKC/SSF/3/15/7: (118b) stairway lighting details: scale fs
  • GKC/SSF/3/15/8: (92c) details of display board & window spandrel lining in library & reading room
  • GKC/SSF/3/15/9: (71c) 2nd & 3rd floor high level windows
  • GKC/SSF/3/15/10: (94b) entrance stairway handrail: details

Tube contains:

  • GKC/SSF/3/15/11: (111b) cookery room fitments

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/14/1: (74b) details of handrails & re-instatement work at existing stair
  • GKC/SSF/3/14/2: (202) details of existing stair
  • GKC/SSF/3/14/3: (90b) revised plan of pipe duct
  • GKC/SSF/3/14/4: (235a) signwriting: fire point cupboard
  • GKC/SSF/3/14/5: (235a) signwriting: fire point cupboard
  • GKC/SSF/3/14/6: (235) signwriting: door labels
  • GKC/SSF/3/14/7: (234) barrier rails at main entrance stair
  • GKC/SSF/3/14/8: (233) reading room window shelf unit
  • GKC/SSF/3/14/9: (232) homecraft demonstration: oven unit
  • GKC/SSF/3/14/10: (92B) half full size window details timber

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/13/1: (231) sound column fixing brackets.
  • GKC/SSF/3/13/2: (230) fume shelf detail
  • GKC/SSF/3/13/3: (220) radiator supports at stair landings
  • GKC/SSF/3/13/4: (209) changing room fitments
  • GKC/SSF/3/13/5: (200) underbuilding access
  • GKC/SSF/3/13/6: (206) detail of rooflights over demonstration bench
  • GKC/SSF/3/13/7: (204) quarry tile details- stairways
  • GKC/SSF/3/13/8: (208) shower cubicles
  • GKC/SSF/3/13/9: (203) staff cloakroom/ corrridor screen
  • GKC/SSF/3/13/10: (202) cloakroom fittings - basement

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/12/1: (133a) stage control balcony: details of parapet
  • GKC/SSF/3/12/2: (132) sub station site plan
  • GKC/SSF/3/12/3: (136a) high level internal glazing.
  • GKC/SSF/3/12/4: (129) plinth below instructor's bench/ science room
  • GKC/SSF/3/12/5: (135) details of blackboards: cookery & cookery laundry
  • GKC/SSF/3/12/6: (133) balcony details overlooking stage
  • GKC/SSF/3/12/7 :(131) proposed consumer substation
  • GKC/SSF/3/12/8: (130) existing site for consumer sub station

Tube contains:

  • GKC/SSF/3/12/9: (136) miscellaneous
  • GKC/SSF/3/12/10: (127) needlework room fitments

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/11/1: (126) hosereels: metal supports.
  • GKC/SSF/3/11/2: (125) alterations to window openings at existing school -details can be modified to suit
  • GKC/SSF/3/11/3: (123) access bridge steel work details
  • GKC/SSF/3/11/4: (122) doors 19 & 25: sections
  • GKC/SSF/3/11/5: (119a) stairway no2 handrail layout
  • GKC/SSF/3/11/6: (121) doors 19 &25 plans & section
  • GKC/SSF/3/11/7: (120) doors 15 & 16: elevs & details
  • GKC/SSF/3/11/8: (117a) stairway details 1/4fs
  • GKC/SSF/3/11/9: (118a) stairway No1 handrail layout
  • GKC/SSF/3/11/10: (116) fume cupboard: detail & plan

*Not available / given

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/10/1: (105) details 2nd & 3rd windows: scale 1/2 full size
  • GKC/SSF/3/10/2: (115) cookery/laundery fitment & fume cupboard details
  • GKC/SSF/3/10/3: (113) cookery/laundry fitment details
  • GKC/SSF/3/10/4: (112) needlework room fitments
  • GKC/SSF/3/10/5: (110a) cookery/laundery fitments
  • GKC/SSF/3/10/6: (107) 2nd & 3rd floor window details

Tube contains

  • GKC/SSF/3/10/7: (106) 2nd & 3rd floor window details
  • GKC/SSF/3/10/8: (114a) science room fitments
  • GKC/SSF/3/10/9: (109a) science room fitment details
  • GKC/SSF/3/10/10: (108a) science 1&2 fitments and layout plan

Drawings & Plans: Our Lady & St. Francis School, Charlotte St.

Folder contains:

  • GKC/SSF/3/1/1: (0) key plans/ block plan: scale 1:500
  • GKC/SSF/3/1/2: (1a) key plans/ basement floor plan:scale 1/16"
  • GKC/SSF/3/1/3: (1a) key plans/ basement floor plan (June) :scale 1/16"
  • GKC/SSF/3/1/4: (2) key plans: first floor plan
  • GKC/SSF/3/1/5: (3) key plans/ second floor plan: scale 1/16"
  • GKC/SSF/3/1/6: (3) key plans/ second floor plan: scale 1/16"
  • GKC/SSF/3/1/7: (4) key plans/ third floor plan: scale 1/16"
  • GKC/SSF/3/1/8: (4) key plans/ third floor plan: scale 1/16"
  • GKC/SSF/3/1/9: (5) key sections/ sect 2-2, 3-3 & 4-4:scale 1/16"
  • GKC/SSF/3/1/10: (1) key plans/ground floor plans:cale 1/16

*Not available / given

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/9/1: electricity sub-station/ reinforced concrete enclosure:1/4"=1'0"
  • GKC/SSC/3/9/2: (100) joinerwork- showers/roof- east: 1/4"=1'0"
  • GKC/SSC/3/9/3: (032) first floor clerestorey window details: FS & 1/4" rep 1'0"
  • GKC/SSC/3/9/4: (022) south stair dimensions/ reinforced concrete: 1"=1'0"
  • GKC/SSC/3/9/5: staff lounge stair enclosure screen:3/4"=1'0"
  • GKC/SSC/3/9/6: staff lounge stair: 3/4"=1'0"
  • GKC/SSC/3/9/7: mezzanine- west: 1/4"=1'0" & details of cupboard fitments 3/4"=1'0"
  • GKC/SSC/3/9/8: gymnasium store fitment: 3/4"=1'0"

Tube contains:

  • GKC/SSC/3/9/9: (091) main stair -section/edge details of stair well: 1/2"=1'0"
  • GKC/SSC/3/9/10: (105) first floor lavatory details: 1/4"=1'0" & 1/2FS

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/8/1: art room chalkboards/details for supporting white writing boards:3/4"=1'0"
  • GKC/SSC/3/8/2: hatch at office/mezzanine: 3/4"=1'0"
  • GKC/SSC/3/8/3: kitchen/sections: 1/4"=1'0".
  • GKC/SSC/3/8/4: assembly hall & music rooms doors & screens at south stair/ plans, sections & elevations: 1/4"=1'0"
  • GKC/SSC/3/8/5: assembly hall & music rooms/details of screens & canopy:3/4"=1'0"
  • GKC/SSC/3/8/6: kitchen servery screen/sections: 3/4"=1'0"
  • GKC/SSC/3/8/7: cloakroom fittings: 1/2"=1'0"

Tube contains:

  • GKC/SSC/3/8/8: copper cladding/gable elevations
  • GKC/SSC/3/8/9: roof plan: 1/8"=1'0"
  • GKC/SSC/3/8/10: details of escape stair to roof homecraft department: 1/2" rep 1'0" & 3" rep 1'0"

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/7/1: stage front details:1/4"=1'0" & 1/4FS
  • GKC/SSC/3/7/2: stage curtain details: 1/4"=1'0" & 1/4FS
  • GKC/SSC/3/7/3: staff lounge kitchen/fitment details: 3/4"=1'0".
  • GKC/SSC/3/7/4: 1/2FS sample nameplates showing lettering layout
  • GKC/SSC/3/7/5: kitchen servery screen/plan,details: 3/4"=1'0"
  • GKC/SSC/3/7/6: kitchen servery screen/plan & elevation: 1/4"=1'0"
  • GKC/SSC/3/7/7: shower changing room fittings: 3/4"=1'0" & 1/2FS
  • GKC/SSC/3/7/8: cloakroom fittings/details:1/4FS
  • GKC/SSC/3/7/9: retail distribution dept/details of shop window: 3/4"=1'0" &1/2FS
  • GKC/SSC/3/7/10: stage equipment/details of hangers: 1/4"=1'0" & 1/4FS

*Not available / given

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/6/1: (324) blockwork/ north & south 1st floor gables: 1/4" rep 1'0"
  • GKC/SSC/3/6/2: (099) roof edge details:1/4FS
  • GKC/SSC/3/6/3: first floor/classroom partitions: 1/4"=1'0"
  • GKC/SSC/3/6/4: ground floor toilets/ heating installation: 1"=1'0"
  • GKC/SSC/3/6/5: ground floor lavatories/cubicles
  • GKC/SSC/3/6/6: kitchen entrance/ brickwork details: 3/4"=1'0"
  • GKC/SSC/3/6/7: kitchen entrance/brickwork details:3/4"=1'0"
  • GKC/SSC/3/6/8: additional brickwork at music rooms: 1/2"=1'0"
  • GKC/SSC/3/6/9: shower roofs/heating unit enclosure: 1"=1'0"
  • GKC/SSC/3/6/10: timber framing/ first floor ceiling.

*Not available / given

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/5/1: external screens/sill details: 1/4FS
  • GKC/SSC/3/5/2: external screens/steel supports: 3/4"=1'0"
  • GKC/SSC/3/5/3: external screens/ elevations:3/4"=1'0"
  • GKC/SSC/3/5/4: exit door at assembly hall/stage: 3/4"=1'0"
  • GKC/SSC/3/5/5: external screens/corner details: FS
  • GKC/SSC/3/5/6: external screens/mullion details:FS
  • GKC/SSC/3/5/7: external screens/sill & head details: FS
  • GKC/SSC/3/5/8: external screens/sill details gymnasium: FS
  • GKC/SSC/3/5/9: external windows/mezzanine level details: 1/4FS
  • GKC/SSC/3/5/10: external screens/details of steel fixings: 1/4FS

*Not available / given

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

PRESENTATION DRAWINGS, DESIGN SCHEMES:

  • GKC/SSC/3/48/1: (K1) site plan: 1/32"
  • GKC/SSC/3/48/2: (K2) lower ground floor plan: 1/16"
  • GKC/SSC/3/48/3: (K3) ground floor plan: 1/16"
  • GKC/SSC/3/48/4: (K4) first floor plan: 1/16"
  • GKC/SSC/3/48/5: (K5) second floor plan: 1/16"
  • GKC/SSC/3/48/6: (K6) third floor and roof plans: 1/16"
  • GKC/SSC/3/48/7: (K9) east and west elevations: 1/16"
  • GKC/SSC/3/48/8: (K10) north and south elevations: 1/16"

*Not available / given

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Tube 31 contains:

  • GKC/SSC/3/47/1: (A7) sections: 1/8"-1'0"

Folder contains:

  • GKC/SSC/3/47/2: measured perspective
  • GKC/SSC/3/47/3: series of reductions - sections and elevations: 1:575
  • GKC/SSC/3/47/4: series of reductions - plans of ground, mezzanine and lower ground floor: 1:575
  • GKC/SSC/3/47/5: series of reductions - first, second and third floor plans: 1:575

Tube 32 contains:

  • GKC/SSC/3/47/6: (A6) third floor & roof plan:1/8"-1'0"
  • GKC/SSC/3/47/7: (A4) first floor plan:1/8"-1'0"
  • GKC/SSC/3/47/8: (A2) lower ground floor/ mezzanine floor: 1/8"-1'0"
  • GKC/SSC/3/47/9: (A3) ground floor/ plan:1/8"-1'0"
  • GKC/SSC/3/47/10: (A5) second floor plan:1/8"-1'0"

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/46/1: (A44) boiler house/ chimney: 1/8" & 1"
  • GKC/SSC/3/46/2: elevations & sections
  • GKC/SSC/3/46/3: (151) proposed janitor's house comprising two 4 apartment semi-detached two storey dwellings: 1/8"=1'0"
  • GKC/SSC/3/46/4: fencing layout & details: 1/8"=1'0" & 1"=1'0"
  • GKC/SSC/3/46/5: (7) sections
  • GKC/SSC/3/46/6: (8) sections
  • GKC/SSC/3/46/7: (11) north elevation
  • GKC/SSC/3/46/8: (3A) fire precautions/ first floor plan deck level:1/8"-1'0"
  • GKC/SSC/3/46/9: (13) dining hall/ plan, elevation & sections

Tube contains:

  • GKC/SSC/3/46/10: (A3) ground floor plan:1/8"-1'0"

Drawings & Plans: Our Lady's R.C. High School, Cumbernauld

Folder contains:

  • GKC/SSC/3/45/1: (161) window layout:1/8" REP 1'0",1/4" REP 1'0" & FS
  • GKC/SSC/3/45/2: (159) roof & fascia details:1/2" REP 1'0"
  • GKC/SSC/3/45/3: (153) found. plan: 1/4" REP 1'0"
  • GKC/SSC/3/45/4: (155) retaining wall/ sections: 1/4" REP 1'0"
  • GKC/SSC/3/45/5: (157) joist layout:1/4" REP 1'0"
  • GKC/SSC/3/45/6: (160) window details:1/2" REP 1'0"
  • GKC/SSC/3/45/7: (156) blockwork:1/4" REP 1'0"
  • GKC/SSC/3/45/8: janitors' houses kitchen fitments:1/2"=1'0"
  • GKC/SSC/3/45/9: janitors' houses stairs: 3/4"=1'0" & 1/4FS
  • GKC/SSC/3/45/10: janitors' housesexternal doors/ lower ground floor:1"=1'0" &1/2FS

*Not available / given

Results 1 to 50 of 1387