Windows: general & practical teaching blocks
Tabernacle drawing/ front & side elevation, roof & base plans: 1/4"=1"
Section AA/ library & lounge
Refectory lectern: 11/2"
Plan showing road sewer & ground levels: 1/16=1ft
(P8) Practical teaching block: elevations
(P7) Practical teaching block: sections
(P6) Practical teaching block: section & elevation
(P4) First floor plan: water services
(P3) Ground floor plan: water services
LKS2 library plan
LKS1 library plan
(K9) phase 2: 1/8"
Holywell site redevelopment / sections: 1"=8'0"
(G3A) General teaching block: revised second floor plan
(G17) R.C. frame
(G16) R.C. structure
(G10) General teaching block: cross section
Details of RW outlets to gutter units: 1/2FS
Details of RW outlets to Balc Units: 1/2FS
Commemorative gavel (Version 9)
Commemorative gavel (Version 8)
Commemorative gavel (Version 7)
Commemorative gavel (Version 6)
Commemorative gavel (Version 5)
Commemorative gavel (Version 4)
Commemorative gavel (Version 3)
Commemorative gavel (Version 2)
Commemorative gavel (Version 1)
(A7) Sections: 1/8"-1'0"
(A3) Assembly & gym block
(A2.44) first floor plan
(A2.42) basement plan
(A2.41) block & locality plan: 1"=16'0"
(9) Janitors' houses
(64) Kilmahew House
(6) Heating chamber
(5R) Layout elevations: 1/4"-1'0"
(5) Site plan
(284) Sanctuary rooflight details
(282) Classroom block/ layout of roof boarding: 1/4"-1'0"
(235) Toilets/convector details: 1"-1'0"
(226) Common room floor plan: 1/4"-1'0"
(220A) Table desk for SBR: 1" & 1/2FS
(1R2) Site plan: 1-500
(18) Drainage plan
(129R1) Floor plan: 1/4"
(128) Sacristy floor plan: 1/4"
(122) Setting out/ sanctuary block
(113R1) 1/8" Roof joist layout